The challenge was to design and build state-of-the-art, high-performance film, and television studios in a very challenging construction environment.
The studio land was situated on the Yarra River flood plain with no solid foundation material to work with. Further, a multi-lane express way was located next to the proposed complex at roof level. A high performance and lightweight acoustic shell was to be the key to a successful project outcome.
Architect: Hassell & Benier Francis
Builder: Probuild
Installer: Barden Steel Deck
Acoustic Consultant: Marshall Day
Durra System: Roof Ceiling System
Subscribe to our newsletter to stay up to
date on the latest news and innovations.